Project information
Fulfillment of OP 7.4 by Iberdrola´s CCGT units
June 2026 - July 2026
Funding entity Iberdrola Generación Térmica S.L.
This work has performed the calculations of the fulfillment of OP 7.4 by Iberdrola's CCGT units.
Research topics:
- Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks
IberdrolaCumplimientoCiclos